Build a DIY Vapour Barrier Over a Concrete Slab Before Gym Flooring Installation
đź›’ Shopping List
- Polyethylene sheeting (€10–€30)
- Adhesive tape (€5–€15)
- Seam tape (€5–€15)
- Insulation board (optional) (€10–€40)
âś… Outcome
- Professional finish with safe anchoring.
- Beginner-friendly, clean tools list.

Creating a home gym can be the perfect solution for those who want to stay fit without the hassle of a commercial gym. However, laying gym flooring directly on a concrete slab can lead to moisture issues that damage both the flooring and your health. Installing a vapour barrier is an essential step to ensure your gym flooring lasts longer and maintains a healthy environment. This guide will walk you through the process of building a vapour barrier over a concrete slab, providing you with the knowledge to execute it with confidence.
Overview
A vapour barrier is a material designed to prevent moisture from passing through surfaces, in this case, a concrete slab. Concrete is porous and can absorb moisture from the ground, which can lead to problems like mould and mildew growth, especially when covering it with flooring materials. Installing a vapour barrier keeps your gym environment dry and protects the longevity of your flooring. While there are various options for vapour barriers, using polyethylene sheeting is a common and effective choice thanks to its durability and moisture resistance.
Materials
- Polyethylene sheeting (minimum 0.15 mm thickness)
- Adhesive tape (moisture-resistant)
- Seam tape (if needed)
- Optional: insulation board (for added thermal protection)
Tools Needed
- Utility knife
- Measuring tape
- Ruler or straight edge
- Scissors
- Concrete adhesive (optional)
Preparation
Before you dive into the installation, it’s crucial to prepare your workspace and ensure that the concrete slab is in good condition. Start by inspecting the slab for any cracks or signs of excessive moisture. If you notice any significant issues, it’s wise to address them before proceeding. Clean the surface thoroughly to remove any dirt, dust, or debris, as these can interfere with the barrier’s effectiveness. Lastly, ensure that the area is dry; moisture in the slab can compromise your vapour barrier.
Step-by-Step Instructions
- Measure the area: Begin by measuring the dimensions of the concrete slab where you want to install the vapour barrier. Use a measuring tape to get accurate measurements, and jot them down. This step is essential to ensure that you purchase enough polyethylene sheeting to cover the entire area, with some overlap for secure sealing. Don’t forget to measure around any obstacles like pillars or pipes.
- Cut the polyethylene sheeting: Once you have your measurements, roll out the polyethylene sheeting and cut it to size using a utility knife. Make sure to leave an extra 15 cm of overlap on all sides, as this will be useful for securing the barrier to the walls or other surfaces. If you’re dealing with a particularly large area, consider cutting multiple sheets to make the installation process more manageable.
- Lay down the sheeting: Start by laying the first piece of polyethylene sheeting onto the concrete slab. Ensure that it lies flat and is free from wrinkles. If you’re working with multiple sheets, overlap them by at least 15 cm, as this will help to prevent moisture from seeping through the seams. If you find any wrinkles, smooth them out gently as you go.
- Secure the seams: Once the sheeting is in place, it’s time to secure the seams. Use the adhesive tape to tightly seal the overlaps between the sheets, ensuring they are well bonded. For added protection, consider using seam tape over the seams for extra durability. This step is crucial, as it ensures that moisture cannot penetrate through any gaps.
- Trim excess material: After securing the sheeting, you may notice some excess material extending beyond the edges of the concrete slab. Use scissors or a utility knife to carefully trim away any excess polyethylene. Make sure that you leave enough material to secure it to the walls or any other surfaces as needed.
- Attach to walls (if necessary): If your vapour barrier needs to extend up the walls, now is the time to secure it. Use moisture-resistant tape or adhesive to attach the edges of the sheeting to the walls. This step is vital as it prevents moisture from entering around the edges of the barrier.
- Inspect your work: Finally, double-check all the seams and edges to ensure that everything is securely sealed. Look for any gaps or areas where the sheeting may not be lying flat against the slab. Address any issues before proceeding with your gym flooring installation.
Tips & Techniques
Common Mistakes
- Not allowing enough overlap when sealing the seams, which can lead to moisture penetration.
- Failing to clean the concrete slab thoroughly, resulting in poor adhesion of the vapour barrier.
- Neglecting to inspect the slab for cracks or moisture issues prior to installation.
Safety Advice
- Ensure proper ventilation in the workspace, especially if using adhesive products.
- Wear gloves and safety glasses when handling sharp tools and materials.
- Be cautious of slip hazards on the concrete surface.
FAQ
Q? Why is a vapour barrier necessary for gym flooring?

A.
A vapour barrier is essential as it prevents moisture from the concrete slab from damaging the flooring, which can lead to mould growth and shorten the lifespan of your gym surfaces.

Q? Can I use a different type of material instead of polyethylene?
A.
While polyethylene sheeting is the most common choice due to its effectiveness, other materials such as foil-faced insulation may also be used, though they may require different installation techniques. It’s important to choose a material that is specifically designed to act as a vapour barrier.
Brico loco